{"data":{"id":"us-ak/as-09.45.886","jurisdiction":"us-ak","citation":"AS 09.45.886","heading":"Procedure after inspection.","body":"Within 14 days after completion of an inspection made under AS 09.45.885, the construction professional shall serve on the claimant a written\n(1) offer to repair the defect without charge to the claimant; the offer must include a report of the scope of the inspection, the findings and results of the inspection, a description of any repairs necessary to repair the defect, and a schedule for the completion of the repairs;\n(2) offer to compromise and settle the claim by a payment of money under AS 09.45.882(b)(2); or\n(3) statement that the construction professional will not repair the defect.","path":["Title 9. Code of Civil Procedure.","Chapter 45. Actions Relating to Real Property.","Article 11. Action for Dwelling Design, Construction, or Remodeling Claims."],"source_url":"https://www.akleg.gov/basis/statutes.asp#09.45.886","current_through":"Alaska Statutes 2025 (34th Legislature, 2025-2026)","vintage":"","retrieved_at":"2026-09-02T06:16:32Z","sha256":"613fc0dd7bf5a4d04516018fcc427ff0a680de540646796a67c94875cfd3558b","source_id":"us-ak","stale":false,"prev":"us-ak/as-09.45.885","next":"us-ak/as-09.45.887"},"notice":"GroundRules: Original legal text. Not legal advice."}
