{"data":{"id":"us-ak/as-29.60.440","jurisdiction":"us-ak","citation":"AS 29.60.440","heading":"Limitation.","body":"AS 29.60.400 — 29.60.440 do not require that a recipient of a grant for a feasibility study must proceed with construction of the project, regardless of whether the project is determined to be feasible.","path":["Title 29. Municipal Government.","Chapter 60. State Programs.","Article 1. Community Facilities Grants."],"source_url":"https://www.akleg.gov/basis/statutes.asp#29.60.440","current_through":"Alaska Statutes 2025 (34th Legislature, 2025-2026)","vintage":"","retrieved_at":"2026-09-02T06:18:16Z","sha256":"1967c676b6c6b87c245a767141130c5dda6f068e995628d917c4cba50fef3210","source_id":"us-ak","stale":false,"prev":"us-ak/as-29.60.430","next":"us-ak/as-29.60.450"},"notice":"GroundRules: Original legal text. Not legal advice."}
