{"data":{"id":"us-ak/as-35.15.110","jurisdiction":"us-ak","citation":"AS 35.15.110","heading":"Title to site and completion of project.","body":"(a) Before advertisement for bids or construction contract negotiations, the department shall approve both the project site and the land interest in the site.\n(b) Responsibility for maintenance of the project shall be established in the original contract agreement. The department shall participate in the final inspection of the project and approve of the final documents on the project.","path":["Title 35. Public Buildings, Works, and Improvements.","Chapter 15. Construction Procedures.","Article 2. Local Control of Public Works Projects."],"source_url":"https://www.akleg.gov/basis/statutes.asp#35.15.110","current_through":"Alaska Statutes 2025 (34th Legislature, 2025-2026)","vintage":"","retrieved_at":"2026-09-02T06:18:45Z","sha256":"666276c0769d3ceabd0f185350d44f5c4c65970846f8b93430678afd3eb4c421","source_id":"us-ak","stale":false,"prev":"us-ak/as-35.15.100","next":"us-ak/as-35.15.120"},"notice":"GroundRules: Original legal text. Not legal advice."}
