{"data":{"id":"us-ak/as-36.30.365","jurisdiction":"us-ak","citation":"AS 36.30.365","heading":"Notice of intent to award a contract.","body":"At least 10 days before the formal award of a contract that is not for construction, and at least five days before the award of a construction contract, under this chapter, except for a contract awarded under AS 36.30.300 — 36.30.320, the procurement officer shall provide to each bidder or offeror notice of intent to award a contract. The notice must conform to regulations adopted by the commissioner.","path":["Title 36. Public Contracts.","Chapter 30. State Procurement Code.","Article 6. Contract Formation and Modification."],"source_url":"https://www.akleg.gov/basis/statutes.asp#36.30.365","current_through":"Alaska Statutes 2025 (34th Legislature, 2025-2026)","vintage":"","retrieved_at":"2026-09-02T06:18:53Z","sha256":"25da3bc5fb8b072826034e7bbff4587c49b935c3afcdd8c67731f9de1b56f366","source_id":"us-ak","stale":false,"prev":"us-ak/as-36.30.362","next":"us-ak/as-36.30.370"},"notice":"GroundRules: Original legal text. Not legal advice."}
