{"data":{"id":"us-ak/as-36.90.240","jurisdiction":"us-ak","citation":"AS 36.90.240","heading":"Form of certain notices.","body":"A notice under AS 36.90.220(2) or 36.90.230(a)(1) must be in writing and must state the amount being withheld, the specific causes for the withholding under the terms of the subcontract, and the remedial actions to be taken by the subcontractor to receive payment of the amount withheld.","path":["Title 36. Public Contracts.","Chapter 90. Miscellaneous Provisions.","Article 3. Public Construction Contract Payment."],"source_url":"https://www.akleg.gov/basis/statutes.asp#36.90.240","current_through":"Alaska Statutes 2025 (34th Legislature, 2025-2026)","vintage":"","retrieved_at":"2026-09-02T06:18:53Z","sha256":"2f243a93ff259cf300d62d60b2e6bd580a77f3e99d766d144e9a3e1bf9d2bbc7","source_id":"us-ak","stale":false,"prev":"us-ak/as-36.90.230","next":"us-ak/as-36.90.250"},"notice":"GroundRules: Original legal text. Not legal advice."}