{"data":{"id":"us-al/ala.-code-35-11-215","jurisdiction":"us-al","citation":"Ala. Code § 35-11-215","heading":"Verified Statement - Time for Filing.","body":"The lien declared in this division shall be deemed lost unless the statement referred to in Section 35-11-213 shall be filed by every original contractor within six months and by every journeyman and day laborer within 30 days, and by every other person entitled to such lien within four months, after the last item of work or labor has been performed or the last item of any material, fixture, engine, boiler, or machinery has been furnished for any building or improvement on land or for repairing, altering, or beautifying the same under or by virtue of any contract with the owner or proprietor thereof, or his agent, architect, trustee, contractor, or subcontractor.","path":["Title 35 Property.","Chapter 11 Liens.","Article 5 Liens of Particular Persons or Classes of Persons.","Division 8 Mechanics and Materialmen."],"source_url":"https://alison.legislature.state.al.us/code-of-alabama?section=35-11-215","current_through":"Act 2026-611","vintage":"","retrieved_at":"2026-09-03T14:01:51Z","sha256":"74449c3887f147d0593f0d044dd6c40628921d89b95358375e5c2acd32035822","source_id":"us-al","stale":false,"prev":"us-al/ala.-code-35-11-214","next":"us-al/ala.-code-35-11-216"},"notice":"GroundRules: Original legal text. Not legal advice."}
