{"data":{"id":"us-ar/ark.-code-ann.-15-58-403","jurisdiction":"us-ar","citation":"Ark. Code Ann. § 15-58-403","heading":"Costs of projects","body":"The costs for each proposed project under the abandoned mine reclamation program shall include:\n\n(1) Actual construction costs;\n\n(2) Actual operation and maintenance costs of permanent facilities;\n\n(3) Planning and engineering costs;\n\n(4) Construction inspection costs; and\n\n(5) Other necessary administrative expenses.","path":["AR Code","Title 15","Chapter 58","Subchapter 4"],"source_url":"https://oss-data-us.vaquill.ai/v2026.08/us_ar_statutes.parquet","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:41Z","sha256":"5084fd395a845fdf6965ec953a77fa340b5d0b998d9fe9db0bb1ebd79c667fcc","source_id":"us-ar","stale":false,"prev":"us-ar/ark.-code-ann.-15-58-402","next":"us-ar/ark.-code-ann.-15-58-404"},"notice":"GroundRules: Original legal text. Not legal advice."}
