{"data":{"id":"us-ar/ark.-code-ann.-15-75-324","jurisdiction":"us-ar","citation":"Ark. Code Ann. § 15-75-324","heading":"Permit application approvals","body":"All class one (1) permit application approvals must have all prerequisites met and the permit issued within six (6) months of approval by the Liquefied Petroleum Gas Board. If not issued within six (6) months of approval, the application will be returned to the applicant and a new application must be submitted to the board thirty (30) days prior to the date of the regular meeting at which the application is to be considered.","path":["AR Code","Title 15","Chapter 75","Subchapter 3"],"source_url":"https://oss-data-us.vaquill.ai/v2026.08/us_ar_statutes.parquet","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:41Z","sha256":"1434566fd341b444396631505d8397b8591ab99996b9001f958e768266e6e876","source_id":"us-ar","stale":false,"prev":"us-ar/ark.-code-ann.-15-75-323","next":"us-ar/ark.-code-ann.-15-75-401"},"notice":"GroundRules: Original legal text. Not legal advice."}
