{"data":{"id":"us-ar/ark.-code-ann.-22-9-211","jurisdiction":"us-ar","citation":"Ark. Code Ann. § 22-9-211","heading":"Renovation of historic sites - Payment","body":"(a) The contracting agency shall establish, as part of the contract, a maximum compensation for the project.\n\n(b) Payment shall be based on the work actually done and the materials actually used.\n\n(c) The contractor shall submit periodic invoices for labor, materials, and overhead and profit in accordance with the rates established in the bid proposal.","path":["AR Code","Title 22","Chapter 9","Subchapter 2"],"source_url":"https://oss-data-us.vaquill.ai/v2026.08/us_ar_statutes.parquet","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:41Z","sha256":"bac6710e610e637740dd49b6a1c4c9a9d6d845d81815f44844b7e2704b56fa5b","source_id":"us-ar","stale":false,"prev":"us-ar/ark.-code-ann.-22-9-210","next":"us-ar/ark.-code-ann.-22-9-212"},"notice":"GroundRules: Original legal text. Not legal advice."}
