{"data":{"id":"us-ar/ark.-code-ann.-22-9-806","jurisdiction":"us-ar","citation":"Ark. Code Ann. § 22-9-806","heading":"Construction document preparation - Prohibited terms","body":"(a) A public agency or a construction manager or other contracting entity acting on behalf of a public agency shall not place a term described in § 22-9-804 in bid specifications, project agreements, or other controlling documents relating to the construction, repair, remodeling, or demolition of a public improvement.\n\n(b) A term included in a contract in violation of subsection (a) of this section is void.","path":["AR Code","Title 22","Chapter 9","Subchapter 8"],"source_url":"https://oss-data-us.vaquill.ai/v2026.08/us_ar_statutes.parquet","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:41Z","sha256":"ec8b0008ef2af1ebfc295a01f8af8b1d9bb679429e64637d8f42dc3d8781ae6a","source_id":"us-ar","stale":false,"prev":"us-ar/ark.-code-ann.-22-9-805","next":"us-ar/ark.-code-ann.-22-9-807"},"notice":"GroundRules: Original legal text. Not legal advice."}
