{"data":{"id":"us-ar/ark.-code-ann.-23-3-703","jurisdiction":"us-ar","citation":"Ark. Code Ann. § 23-3-703","heading":"Establishment of rates","body":"The Arkansas Public Service Commission shall establish rates to be paid by an electric utility to qualifying cogeneration and small power production facilities which do not, over the term of the purchased power contract, exceed avoided costs and are based upon the preponderance of evidence in the record before the commission. However, rates established for purchases from qualifying facilities whose construction commenced earlier than November 9, 1978, may be ten percent (10%) less than avoided costs.","path":["AR Code","Title 23","Chapter 3","Subchapter 7"],"source_url":"https://oss-data-us.vaquill.ai/v2026.08/us_ar_statutes.parquet","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:41Z","sha256":"add37fa3aef3461ee0921328b7837f45ff103bdf93da318fad17ab3fcd0f6f9b","source_id":"us-ar","stale":false,"prev":"us-ar/ark.-code-ann.-23-3-702","next":"us-ar/ark.-code-ann.-23-3-704"},"notice":"GroundRules: Original legal text. Not legal advice."}
