{"data":{"id":"us-ar/ark.-code-ann.-8-9-807","jurisdiction":"us-ar","citation":"Ark. Code Ann. § 8-9-807","heading":"Construction and operation","body":"The entities under the federal charter under § 8-9-804 shall be responsible for the construction and operation of the spent nuclear fuel interim storage and recycling facility and through the use of federal funds shall:\n\n(1) Receive the design documentation completed under § 8-9-804 ;\n\n(2) Develop construction documents, update cost data, and establish a schedule for construction to be completed with a national laboratory;\n\n(3) Contract with a design firm to provide design and construction documents for the spent nuclear fuel interim storage and recycling facility containment building;\n\n(4) Contract with a contractor to build the spent nuclear fuel interim storage and recycling facility as designed and provide start-up assistance with the spent nuclear fuel interim storage and recycling facilities; and\n\n(5) Contract with a national laboratory to provide installation management of the pyrotechnic lines inside the spent nuclear fuel interim storage and recycling facility containment building and to provide start-up management and training for permanent operators and maintenance.","path":["AR Code","Title 8","Chapter 9","Subchapter 8"],"source_url":"https://oss-data-us.vaquill.ai/v2026.08/us_ar_statutes.parquet","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:41Z","sha256":"dd61af52879043710e1fde7dae94ca4872c4274f3890fb1ef3b79ecf77365a90","source_id":"us-ar","stale":false,"prev":"us-ar/ark.-code-ann.-8-9-806","next":"us-ar/ark.-code-ann.-8-9-808"},"notice":"GroundRules: Original legal text. Not legal advice."}
