{"data":{"id":"us-az/a.r.s.-3-3513","jurisdiction":"us-az","citation":"A.R.S. § 3-3513","heading":"Compliance schedules","body":"Notwithstanding section 3-3512, subsection I relating to schedules of compliance:\n\n1. Gasoline dispensing facilities located in area A or in any other geographical area as provided in section 3-3512, subsection G for which construction began after the certification of rules adopted pursuant to section 3-3512 shall be constructed to include stage I vapor recovery systems that meet the minimum standards set forth in this chapter and division rules.\n\n2. All gasoline dispensing sites located in area A or in any other geographical area as provided in section 3-3512, subsection G that begin underground storage tank replacement and that apply for a permit pursuant to title 49, chapter 3, article 3 or 5 on or after September 30, 1992 shall be in compliance within six months after the effective date of the rules adopted pursuant to section 3-3512. Compliance with this article is a condition of the permit.","path":["Title 3 Agriculture"],"source_url":"https://www.azleg.gov/ars/3/03513.htm","current_through":"2026-09-04","vintage":"2026-08-09","retrieved_at":"2026-09-04T00:49:56Z","sha256":"366a4a3f88c8b1a8c782cd18c00210b3ef7b4effc6d7259b5b4f1b8771dd1363","source_id":"us-az","stale":true,"prev":"us-az/a.r.s.-3-3512","next":"us-az/a.r.s.-3-3514"},"notice":"GroundRules: Original legal text. Not legal advice."}
