{"data":{"id":"us-az/a.r.s.-30-811","jurisdiction":"us-az","citation":"A.R.S. § 30-811","heading":"Electricity producers; safeguards; electromagnetic pulse; definition","body":"A. Notwithstanding any other law, electricity producers in this state shall consider the dangers associated with an electromagnetic pulse and take steps to secure a continuous supply of electricity to the residents of this state.\n\nB. For the purposes of this section, \"electromagnetic pulse\" has the same meaning prescribed in section 26-305.03.","path":["Title 30 Power"],"source_url":"https://www.azleg.gov/ars/30/00811.htm","current_through":"2026-09-04","vintage":"2026-08-09","retrieved_at":"2026-09-04T00:49:56Z","sha256":"3b38b1c8b7bba1058043dbb4d43d643a334835f8e2a0ba289ce2b0c8c5edc02a","source_id":"us-az","stale":true,"prev":"us-az/a.r.s.-30-810","next":"us-az/a.r.s.-30-901"},"notice":"GroundRules: Original legal text. Not legal advice."}
