{"data":{"id":"us-az/a.r.s.-40-360.09","jurisdiction":"us-az","citation":"A.R.S. § 40-360.09","heading":"Filing fees; utility siting fund","body":"The fee to be paid for each application is as follows and shall be paid to the committee for deposit, pursuant to sections 35-146 and 35-147, in a special fund to be known as the utility siting fund:\n\n1. For a new proposed plant site and associated transmission line site, ten thousand dollars.\n\n2. For expansion of an existing plant site and a new proposed transmission line site, seven thousand five hundred dollars.\n\n3. For expansion of an existing plant site only, five thousand dollars.\n\n4. For a new proposed transmission line site one hundred miles or more in length, five thousand dollars.\n\n5. For a new proposed transmission line site over fifty but less than one hundred miles in length, two thousand five hundred dollars.\n\n6. For a new proposed transmission line site fifty miles or less in length, one thousand dollars.\n\n7. For a new proposed transmission line site paralleling an existing transmission line site, regardless of length, one thousand dollars.","path":["Title 40 Public Utilities and Carriers"],"source_url":"https://www.azleg.gov/ars/40/00360-09.htm","current_through":"2026-09-04","vintage":"2026-08-09","retrieved_at":"2026-09-04T00:49:56Z","sha256":"5a46ec3b0239763229bd3846db2c45c57b7b9a6e1e73323501d9c04c38ef0af8","source_id":"us-az","stale":true,"prev":"us-az/a.r.s.-40-360.08","next":"us-az/a.r.s.-40-360.10"},"notice":"GroundRules: Original legal text. Not legal advice."}
