{"data":{"id":"us-az/a.r.s.-45-1444","jurisdiction":"us-az","citation":"A.R.S. § 45-1444","heading":"Floodplain regulations; effect of failure to adopt","body":"The director shall not disburse any monies pursuant to this chapter to pay any costs of lands, easements and rights-of-way for a flood control project defined by section 45-1441, paragraph 3, subdivision (a) for which the appropriate public agency fails to establish, within a reasonable time after notification by the director, the necessary floodplain regulations for the area classified as a designated floodway by the director upon review of the complete federal or federally assisted project report.","path":["Title 45 Waters"],"source_url":"https://www.azleg.gov/ars/45/01444.htm","current_through":"2026-09-04","vintage":"2026-08-09","retrieved_at":"2026-09-04T00:49:56Z","sha256":"cfa58a5fe5d28600b7cc339e00d0e7556e1cb12e8d3b00e0b17f31cd75f97efa","source_id":"us-az","stale":true,"prev":"us-az/a.r.s.-45-1443","next":"us-az/a.r.s.-45-1445"},"notice":"GroundRules: Original legal text. Not legal advice."}
