{"data":{"id":"us-az/a.r.s.-49-859","jurisdiction":"us-az","citation":"A.R.S. § 49-859","heading":"Application to water quality permits","body":"A. Neither the classification of a particular type of waste as a special waste nor the adoption or revision of the best management practices criteria constitutes a major modification to a facility with a groundwater quality protection permit or an aquifer protection permit unless that action otherwise meets the definition of new facility prescribed by section 49-201.\n\nB. The director's approval of a special waste management plan either before or after the adoption of best management practices criteria does not constitute a major modification of a facility with a groundwater quality protection permit or an aquifer protection permit unless that action otherwise meets the definition of new facility prescribed by section 49-201.","path":["Title 49 The Environment"],"source_url":"https://www.azleg.gov/ars/49/00859.htm","current_through":"2026-09-04","vintage":"2026-08-09","retrieved_at":"2026-09-04T00:49:56Z","sha256":"173d8b916816e9de210bde8cf3736fc8a6c279b5e439b5b655bbe8b05b36ee28","source_id":"us-az","stale":true,"prev":"us-az/a.r.s.-49-858","next":"us-az/a.r.s.-49-860"},"notice":"GroundRules: Original legal text. Not legal advice."}
