{"data":{"id":"us-az/a.r.s.-9-554","jurisdiction":"us-az","citation":"A.R.S. § 9-554","heading":"License required before construction","body":"A. A new industrial gas pipeline shall not be constructed within any incorporated city or town or within the unincorporated area of a county before a license is issued as provided in this article.\n\nB. A licensing authority may terminate a license according to its terms and conditions if a license holder is in default under the license.","path":["Title 9 Cities and Towns"],"source_url":"https://www.azleg.gov/ars/9/00554.htm","current_through":"2026-09-04","vintage":"2026-08-09","retrieved_at":"2026-09-04T00:49:56Z","sha256":"cb3f5188a1585e7057527ba2ed61cb85f4ed3880f9476375102cf054363f461f","source_id":"us-az","stale":true,"prev":"us-az/a.r.s.-9-553","next":"us-az/a.r.s.-9-571"},"notice":"GroundRules: Original legal text. Not legal advice."}
