{"data":{"id":"us-ca/civ-924","jurisdiction":"us-ca","citation":"CIV § 924","heading":"","body":"If the builder elects to repair some, but not all of, the claimed unmet standards, the builder shall, at the same time it makes its offer, set forth with particularity in writing the reasons, and the support for those reasons, for not repairing all claimed unmet standards.","path":["Civil Code - CIV","DIVISION 2. PROPERTY [654. - 1422.]","PART 2. REAL OR IMMOVABLE PROPERTY [[755.] - 945.5.]","TITLE 7. REQUIREMENTS FOR ACTIONS FOR CONSTRUCTION DEFECTS [895. - 945.5.]","CHAPTER 4. Prelitigation Procedure [910. - 938.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"417cb9d09622e649ae30bde1ae7a6ac0411b2ec67d5d69e99e8fd90052daf7b0","source_id":"us-ca","stale":false,"prev":"us-ca/civ-923","next":"us-ca/civ-925"},"notice":"GroundRules: Original legal text. Not legal advice."}
