{"data":{"id":"us-ca/edc-17298","jurisdiction":"us-ca","citation":"EDC § 17298","heading":"","body":"Before the commencement of any fabrication, construction, or alteration of a relocatable school building of a type previously approved by the Department of General Services, the written approval of the plans, as to the safety and design of construction, by the Department of General Services, shall be first had and obtained.","path":["Education Code - EDC","TITLE 1. GENERAL EDUCATION CODE PROVISIONS [1. - 32527.]","DIVISION 1. GENERAL EDUCATION CODE PROVISIONS [1. - 32527.]","PART 10.5. SCHOOL FACILITIES [17210. - 17672.]","CHAPTER 3. Construction of School Buildings [17251. - 17376.]","ARTICLE 3. Approvals [17280. - 17317.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"843f3001c7e6859b1715588a289fb7a5699b2ac19b665bada32bcdef95689177","source_id":"us-ca","stale":false,"prev":"us-ca/edc-17297","next":"us-ca/edc-17299"},"notice":"GroundRules: Original legal text. Not legal advice."}
