{"data":{"id":"us-ca/edc-19964","jurisdiction":"us-ca","citation":"EDC § 19964","heading":"","body":"(a) The estimated costs of a project for which an application is submitted shall be consistent with normal public construction costs in the applicant’s area.\n(b) An applicant wishing to construct a project with costs which exceed normal public construction costs in the applicant’s area may apply for a grant in an amount not to exceed 65 percent of the normal costs if the applicant certifies that it is capable of financing the remainder of the project costs from other sources.","path":["Education Code - EDC","TITLE 1. GENERAL EDUCATION CODE PROVISIONS [1. - 32527.]","DIVISION 1. GENERAL EDUCATION CODE PROVISIONS [1. - 32527.]","PART 11. LIBRARIES [18010. - 20092.]","CHAPTER 11. California Library Construction and Renovation Bond Act of 1988 [19950. - 19981.]","ARTICLE 2. California Library Construction and Renovation Program [19955. - 19967.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"25ed03e8e58c5995301132111574090b49b70382493d7b9de8cf8eaca498008d","source_id":"us-ca","stale":false,"prev":"us-ca/edc-19963","next":"us-ca/edc-19965"},"notice":"GroundRules: Original legal text. Not legal advice."}
