{"data":{"id":"us-ca/fgc-8276.3","jurisdiction":"us-ca","citation":"FGC § 8276.3","heading":"","body":"(a) If there is any delay ordered by the director pursuant to Section 8276.2 in the opening of the Dungeness crab fishery in Districts 6, 7, 8, and 9, a vessel shall not take or land crab within Districts 6, 7, 8, and 9 during any closure.\n(b) If there is any delay in the opening of the Dungeness crab season pursuant to Section 8276.2, the opening date in Districts 6, 7, 8, and 9 shall be preceded by a 64-hour gear setting period, as ordered by the director.\n(c) This section shall become inoperative on April 1, 2029, and, as of January 1, 2030, is repealed, unless a later enacted statute, that becomes operative on or before January 1, 2030, deletes or extends the dates on which it becomes inoperative and is repealed.","path":["Fish and Game Code - FGC","DIVISION 6. FISH [5500. - 9101.]","PART 3. COMMERCIAL FISHING [7600. - 9101.]","CHAPTER 2. Particular Varieties of Fish [8140. - 8599.4.]","ARTICLE 6. Crab [8275. - 8285.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"c8532d9b4d9a358362d81969bd298de8e1f6655836c12974e6bbcc5d14a7d27c","source_id":"us-ca","stale":false,"prev":"us-ca/fgc-8276.2","next":"us-ca/fgc-8276.4"},"notice":"GroundRules: Original legal text. Not legal advice."}
