{"data":{"id":"us-ca/gov-58854","jurisdiction":"us-ca","citation":"GOV § 58854","heading":"","body":"Within 30 days after filing, the county surveyor shall review and report on boundaries set forth in the proposal. Failure to report on a proposal within said 30-day period shall be deemed approval of the boundaries as set forth therein.","path":["Government Code - GOV","TITLE 6. DISTRICTS [58000. - 62464.]","DIVISION 1. GENERAL [58000. - 60375.5.]","CHAPTER 3. Change of Boundaries [58850. - 58861.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"db699d869f768da6eba6750af8c3071ff064ef7a6c17900aa7a78dc45002d910","source_id":"us-ca","stale":false,"prev":"us-ca/gov-58853","next":"us-ca/gov-58855"},"notice":"GroundRules: Original legal text. Not legal advice."}
