{"data":{"id":"us-ca/lab-7105","jurisdiction":"us-ca","citation":"LAB § 7105","heading":"","body":"If building operations are suspended and the temporary flooring required by this article is removed, the building shall be replanked upon the resumption of work so that every man at work has a covered floor not more than two stories below.","path":["Labor Code - LAB","DIVISION 5. SAFETY IN EMPLOYMENT [6300. - 9254.]","PART 3. SAFETY ON BUILDINGS [7100. - 7384.]","CHAPTER 1. Buildings Under Construction or Repair [7100. - 7267.]","ARTICLE 1. Floors and Walls [7100. - 7110.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"f2b638da0f7fe7dcc5508eeddc2b6a4cec40ee650c414c9a17e3be69fd7fc26a","source_id":"us-ca","stale":false,"prev":"us-ca/lab-7104","next":"us-ca/lab-7106"},"notice":"GroundRules: Original legal text. Not legal advice."}
