{"data":{"id":"us-ca/lab-7260","jurisdiction":"us-ca","citation":"LAB § 7260","heading":"","body":"Prior to removal of temporary floor plank, employees shall be instructed by assigned supervision the steps to be taken to perform the work safely and in proper sequence.","path":["Labor Code - LAB","DIVISION 5. SAFETY IN EMPLOYMENT [6300. - 9254.]","PART 3. SAFETY ON BUILDINGS [7100. - 7384.]","CHAPTER 1. Buildings Under Construction or Repair [7100. - 7267.]","ARTICLE 4. Structural Steel Framed Buildings [7250. - 7267.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"aec86a12d0445da89316476cca36fe128a68898becc1aaf3734991814227e1b6","source_id":"us-ca","stale":false,"prev":"us-ca/lab-7259","next":"us-ca/lab-7261"},"notice":"GroundRules: Original legal text. Not legal advice."}
