{"data":{"id":"us-ca/lab-7262","jurisdiction":"us-ca","citation":"LAB § 7262","heading":"","body":"When gathering and stacking temporary floor planks from the last panel, the steel erector’s personnel assigned to such work shall be protected by safety belts with life lines attached to a catenary line or other substantial anchorage.","path":["Labor Code - LAB","DIVISION 5. SAFETY IN EMPLOYMENT [6300. - 9254.]","PART 3. SAFETY ON BUILDINGS [7100. - 7384.]","CHAPTER 1. Buildings Under Construction or Repair [7100. - 7267.]","ARTICLE 4. Structural Steel Framed Buildings [7250. - 7267.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"bae8ba0a9192bc1cadc8bc25ca0d1277027cf329d57ece96dcdf82ffcc298db4","source_id":"us-ca","stale":false,"prev":"us-ca/lab-7261","next":"us-ca/lab-7263"},"notice":"GroundRules: Original legal text. Not legal advice."}
