{"data":{"id":"us-ca/pcc-10112.6","jurisdiction":"us-ca","citation":"PCC § 10112.6","heading":"","body":"The department may retain the services of a design professional or construction project manager, or both, throughout the course of the project in order to ensure compliance with this article.","path":["Public Contract Code - PCC","DIVISION 2. GENERAL PROVISIONS [1100. - 22355.]","PART 2. CONTRACTING BY STATE AGENCIES [10100. - 19150.]","CHAPTER 1. State Contract Act [10100. - 10285.5.]","ARTICLE 1.1. Construction Manager/General Contractor Procurement Method for the Department of Water Resources [10112. - 10112.10.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"99337d02fbbc63d65908aa35851694ca63092b08045e31130042c2c02f1225fc","source_id":"us-ca","stale":false,"prev":"us-ca/pcc-10112.5","next":"us-ca/pcc-10112.7"},"notice":"GroundRules: Original legal text. Not legal advice."}
