{"data":{"id":"us-ca/pcc-10122.6","jurisdiction":"us-ca","citation":"PCC § 10122.6","heading":"","body":"Notwithstanding the project cost limit provided in Section 10105, work in excess of twenty-five thousand dollars ($25,000) which would otherwise constitute a project, shall not be done by day’s labor unless the requirements of Section 10122 are met.","path":["Public Contract Code - PCC","DIVISION 2. GENERAL PROVISIONS [1100. - 22355.]","PART 2. CONTRACTING BY STATE AGENCIES [10100. - 19150.]","CHAPTER 1. State Contract Act [10100. - 10285.5.]","ARTICLE 2. Plans and Specifications [10120. - 10129.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"2db437fe6bfddee536a812c231658c584616d50c90c7b16db494d998d79f21e6","source_id":"us-ca","stale":false,"prev":"us-ca/pcc-10122.5","next":"us-ca/pcc-10123"},"notice":"GroundRules: Original legal text. Not legal advice."}
