{"data":{"id":"us-ca/pcc-10254","jurisdiction":"us-ca","citation":"PCC § 10254","heading":"","body":"If the defaults are not remedied within the time specified in the notice, the contractor’s control shall terminate as of the expiration of that time.","path":["Public Contract Code - PCC","DIVISION 2. GENERAL PROVISIONS [1100. - 22355.]","PART 2. CONTRACTING BY STATE AGENCIES [10100. - 19150.]","CHAPTER 1. State Contract Act [10100. - 10285.5.]","ARTICLE 8. Modifications; Performance; Payment [10250. - 10265.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"185400e4f43c10a6a0fbe02bc71b804b0dde8c1e05a43468a65e8df72a0b74fc","source_id":"us-ca","stale":false,"prev":"us-ca/pcc-10253","next":"us-ca/pcc-10255"},"notice":"GroundRules: Original legal text. Not legal advice."}