{"data":{"id":"us-ca/pcc-20130","jurisdiction":"us-ca","citation":"PCC § 20130","heading":"","body":"If the board of supervisors is advised by the county surveyor or engineer that any wharf, chute, or other shipping facility can be constructed or repaired for a sum less than the lowest responsible bid, it may reject all bids and order the work done by day’s work under the supervision and direction of the surveyor or engineer.","path":["Public Contract Code - PCC","DIVISION 2. GENERAL PROVISIONS [1100. - 22355.]","PART 3. CONTRACTING BY LOCAL AGENCIES [20100. - 22199.6.]","CHAPTER 1. Local Agency Public Construction Act [20100. - 20929.]","ARTICLE 3.5. Counties [20120. - 20147.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"671737d3c98ae190e52e7bc7c6b47aaa2b360af358ac0bed2f97fae32a9199cc","source_id":"us-ca","stale":false,"prev":"us-ca/pcc-20129","next":"us-ca/pcc-20131"},"notice":"GroundRules: Original legal text. Not legal advice."}
