{"data":{"id":"us-ca/pcc-20540","jurisdiction":"us-ca","citation":"PCC § 20540","heading":"","body":"All construction contracts shall provide that a maximum of eight hours shall constitute a day’s labor and that three dollars ($3) shall be the minimum amount paid for a day’s labor performed upon any construction work covered by the contract.","path":["Public Contract Code - PCC","DIVISION 2. GENERAL PROVISIONS [1100. - 22355.]","PART 3. CONTRACTING BY LOCAL AGENCIES [20100. - 22199.6.]","CHAPTER 1. Local Agency Public Construction Act [20100. - 20929.]","ARTICLE 33. Joint Highway Districts [20530. - 20541.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"43b5e6d01a4a4f8805b2d7128e5685641b3d4946c426e94824fd865e727b468f","source_id":"us-ca","stale":false,"prev":"us-ca/pcc-20539","next":"us-ca/pcc-20541"},"notice":"GroundRules: Original legal text. Not legal advice."}
