{"data":{"id":"us-ca/pcc-21292","jurisdiction":"us-ca","citation":"PCC § 21292","heading":"","body":"Whenever the board enters into a contract for the erection, construction, alteration, or repair of any public building or other structure, the contract shall not be altered or changed in any manner, except by order adopted by a vote of two-thirds of the board, and the consent of the contractor.","path":["Public Contract Code - PCC","DIVISION 2. GENERAL PROVISIONS [1100. - 22355.]","PART 3. CONTRACTING BY LOCAL AGENCIES [20100. - 22199.6.]","CHAPTER 1.5. Water District Acts [20930. - 21641.]","ARTICLE 95. Santa Cruz County Flood Control and Water Conservation District [21280. - 21297.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"4fde81720e5a5ef108fb26bc9e7545ed477bd1932e34eeb6abce6c6d812c3d78","source_id":"us-ca","stale":false,"prev":"us-ca/pcc-21291","next":"us-ca/pcc-21293"},"notice":"GroundRules: Original legal text. Not legal advice."}
