{"data":{"id":"us-ca/pcc-21568.9","jurisdiction":"us-ca","citation":"PCC § 21568.9","heading":"","body":"If the district elects to award a project pursuant to this article, retention proceeds withheld by the district from the design-build entity or Construction Manager/General Contractor shall not exceed 5 percent if a performance and payment bond, issued by an admitted surety insurer, is required in the solicitation of bids.","path":["Public Contract Code - PCC","DIVISION 2. GENERAL PROVISIONS [1100. - 22355.]","PART 3. CONTRACTING BY LOCAL AGENCIES [20100. - 22199.6.]","CHAPTER 1.5. Water District Acts [20930. - 21641.]","ARTICLE 121.1. Metropolitan Water District of Southern California-Alternative Project Delivery Program [21568. - 21568.11.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"e647a0da524cb8359048f3ced0c0494d05c4fab994dd02c40f9384e05b4436f7","source_id":"us-ca","stale":false,"prev":"us-ca/pcc-21568.8","next":"us-ca/pcc-21568.10"},"notice":"GroundRules: Original legal text. Not legal advice."}
