{"data":{"id":"us-ca/prc-21080.2","jurisdiction":"us-ca","citation":"PRC § 21080.2","heading":"","body":"In the case of a project described in subdivision (c) of Section 21065, the determination required by Section 21080.1 shall be made within 30 days from the date on which an application for a project has been received and accepted as complete by the lead agency. This period may be extended 15 days upon the consent of the lead agency and the project applicant.","path":["Public Resources Code - PRC","DIVISION 13. ENVIRONMENTAL QUALITY [21000. - 21189.91.]","CHAPTER 2.6. General [21080. - 21098.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"cfae8abf35632db39d3fd18c1f0e2aae19d1b57249fe0188e74ff1c5c3b17f9e","source_id":"us-ca","stale":false,"prev":"us-ca/prc-21080.1","next":"us-ca/prc-21080.3"},"notice":"GroundRules: Original legal text. Not legal advice."}
