{"data":{"id":"us-ca/prc-25323","jurisdiction":"us-ca","citation":"PRC § 25323","heading":"","body":"Nothing in this division shall authorize the commission in the performance of its analytical, planning, siting, or certification responsibilities to mandate a specified supply plan for any utility.","path":["Public Resources Code - PRC","DIVISION 15. ENERGY CONSERVATION AND DEVELOPMENT [25000. - 25997.7.]","CHAPTER 4. Integrated Energy Policy Reporting [25300. - 25328.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"6a3aecc99d0e63709aa2fc86942d5d046d29327e555efe3d186eaf491884d7b3","source_id":"us-ca","stale":false,"prev":"us-ca/prc-25322","next":"us-ca/prc-25324"},"notice":"GroundRules: Original legal text. Not legal advice."}
