{"data":{"id":"us-ca/prc-25515","jurisdiction":"us-ca","citation":"PRC § 25515","heading":"","body":"No later than 30 days after the final report is distributed, a hearing or hearings on the final report shall be commenced. Such hearings shall be concluded within 15 days of their commencement.","path":["Public Resources Code - PRC","DIVISION 15. ENERGY CONSERVATION AND DEVELOPMENT [25000. - 25997.7.]","CHAPTER 6. Power Facility and Site Certification [25500. - 25543.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"b2a322742a602f4ececc09736eea8578a0bfa06208c5dda17bdbdc2ea7725f6b","source_id":"us-ca","stale":false,"prev":"us-ca/prc-25514.5","next":"us-ca/prc-25516"},"notice":"GroundRules: Original legal text. Not legal advice."}
