{"data":{"id":"us-ca/prc-2703","jurisdiction":"us-ca","citation":"PRC § 2703","heading":"","body":"The survey shall maintain and service the strong-motion instruments installed, shall collect and interpret all records from the instruments, including records that support earthquake early warning and structural health monitoring, and shall make the records, record interpretations, and technical assistance available to the construction industry.","path":["Public Resources Code - PRC","DIVISION 2. GEOLOGY, MINES AND MINING [2001. - 2815.]","CHAPTER 8. Strong-Motion Instrumentation Program [2700. - 2709.1.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"0effdf57a933d0aebfb821717893eea93ad504ec901ea0222afe1eb299749487","source_id":"us-ca","stale":false,"prev":"us-ca/prc-2702","next":"us-ca/prc-2704"},"notice":"GroundRules: Original legal text. Not legal advice."}
