{"data":{"id":"us-ca/prc-3270.1","jurisdiction":"us-ca","citation":"PRC § 3270.1","heading":"","body":"Within three months of its acquisition of a production facility or at the time of the initial production at its production facility, the facility operator shall file with the division a spill contingency plan.","path":["Public Resources Code - PRC","DIVISION 3. OIL AND GAS [3000. - 3865.]","CHAPTER 1. Oil and Gas Conservation [3000. - 3473.]","ARTICLE 4.4. Regulation of Production Facilities [3270. - 3270.6.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"9089f23a8e7d714c9350f8b805240a7234412228d8b4c53c655821530f139fdf","source_id":"us-ca","stale":false,"prev":"us-ca/prc-3270","next":"us-ca/prc-3270.2"},"notice":"GroundRules: Original legal text. Not legal advice."}
