{"data":{"id":"us-ca/puc-100151","jurisdiction":"us-ca","citation":"PUC § 100151","heading":"","body":"(a) Subject to the limitations of this article, the authority may utilize the CMGC project delivery method for public transit projects within its jurisdiction.\n(b) The authority may enter into a CMGC project delivery method contract pursuant to this article if, after evaluation of the traditional design-bid-build process of construction and of the CMGC project delivery method in a public meeting, the authority makes a written finding that use of the CMGC project delivery method on the specific project under consideration will accomplish one or more of the following objectives: reduce project costs, expedite the project’s completion, or provide features not achievable through the design-bid-build method. This finding shall be made prior to the authority entering into a CMGC project delivery method contract. In the CMGC project delivery method proposal, the written findings shall be included as part of an application for state funds for a transit project.","path":["Public Utilities Code - PUC","DIVISION 10. TRANSIT DISTRICTS [24501. - 107025.]","PART 12. SANTA CLARA VALLEY TRANSPORTATION AUTHORITY [100000. - 100619.]","CHAPTER 5. Powers and Functions of VTA [100110. - 100256.]","ARTICLE 4. Construction Manager/General Contractor Project Delivery Contracts [100150. - 100156.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"c169c3dfe126055e6f27807f74f72e4ed1f811abb9dec7fe05596dad632d77bd","source_id":"us-ca","stale":false,"prev":"us-ca/puc-100150","next":"us-ca/puc-100152"},"notice":"GroundRules: Original legal text. Not legal advice."}
