{"data":{"id":"us-ca/puc-13071","jurisdiction":"us-ca","citation":"PUC § 13071","heading":"","body":"This chapter is complete authority for the issuance of bonds hereunder, and no action or proceeding not required by this chapter shall be necessary for the valid authorization and issuance of such bonds.","path":["Public Utilities Code - PUC","DIVISION 6. MUNICIPAL UTILITY DISTRICT ACT [11501. - 14403.5.]","CHAPTER 6.5. Electric System Improvements [13071. - 13193.]","ARTICLE 1. Application [13071. - 13073.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"67b9c0d36c10ee4c6fcd82d1a6638c9f2bc2bf429be950c9b18d0622fa4579a4","source_id":"us-ca","stale":false,"prev":"us-ca/puc-13024","next":"us-ca/puc-13072"},"notice":"GroundRules: Original legal text. Not legal advice."}
