{"data":{"id":"us-ca/puc-185036.2","jurisdiction":"us-ca","citation":"PUC § 185036.2","heading":"","body":"Notwithstanding the authority’s ability to delegate power to the executive director pursuant to subdivision (a) of Section 185024, a contract change order with a value greater than one hundred million dollars ($100,000,000) shall be approved by the authority.","path":["Public Utilities Code - PUC","DIVISION 19.5. CALIFORNIA HIGH-SPEED RAIL SERVICE [185000. - 185511.]","CHAPTER 3. Responsibilities of the Authority [185030. - 185038.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"c63c3e23bacee8980dcef93da306d449199e9279b27c9c3b5fcd8cd649540043","source_id":"us-ca","stale":false,"prev":"us-ca/puc-185036.1","next":"us-ca/puc-185036.5"},"notice":"GroundRules: Original legal text. Not legal advice."}
