{"data":{"id":"us-ca/puc-185503","jurisdiction":"us-ca","citation":"PUC § 185503","heading":"","body":"If the authority requires the relocation within the right-of-way of any utility facility more than once within a period of 10 years, the authority shall pay the cost of the second relocation and any subsequent relocation within the 10-year period.","path":["Public Utilities Code - PUC","DIVISION 19.5. CALIFORNIA HIGH-SPEED RAIL SERVICE [185000. - 185511.]","CHAPTER 5. Relocation of Utilities [185500. - 185511.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"1d6af4c2cff68bdf38f85f7be22c240f41112dd9635c8acd7a20f41a600302ea","source_id":"us-ca","stale":false,"prev":"us-ca/puc-185502","next":"us-ca/puc-185504"},"notice":"GroundRules: Original legal text. Not legal advice."}
