{"data":{"id":"us-ca/puc-340","jurisdiction":"us-ca","citation":"PUC § 340","heading":"","body":"The Oversight Board shall take the steps that are necessary to ensure the earliest possible incorporation of the Independent System Operator and the Power Exchange as separately incorporated public benefit, nonprofit corporations under the Corporations Code.","path":["Public Utilities Code - PUC","DIVISION 1. REGULATION OF PUBLIC UTILITIES [201. - 3299.100.]","PART 1. PUBLIC UTILITIES ACT [201. - 2120.]","CHAPTER 2.3. Electrical Restructuring [330. - 400.3.]","ARTICLE 2. Oversight Board [334. - 343.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"919d034f7e102b4dedc41db1f268db02f5eb947362ef0711970d37b11f1dfcad","source_id":"us-ca","stale":false,"prev":"us-ca/puc-339","next":"us-ca/puc-341"},"notice":"GroundRules: Original legal text. Not legal advice."}
