{"data":{"id":"us-ca/puc-353.5","jurisdiction":"us-ca","citation":"PUC § 353.5","heading":"","body":"Each electrical corporation, as part of its distribution planning process, shall consider nonutility owned distributed energy resources as a possible alternative to investments in its distribution system in order to ensure reliable electric service at the lowest possible cost.","path":["Public Utilities Code - PUC","DIVISION 1. REGULATION OF PUBLIC UTILITIES [201. - 3299.100.]","PART 1. PUBLIC UTILITIES ACT [201. - 2120.]","CHAPTER 2.3. Electrical Restructuring [330. - 400.3.]","ARTICLE 3.5. Distributed Energy Resources [353.1. - 353.15.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"0fdf8ac9dcc5bdcd3156e6580cdc8fc016ce5ed1c0ece121a6483a37232e2bc0","source_id":"us-ca","stale":false,"prev":"us-ca/puc-353.3","next":"us-ca/puc-353.7"},"notice":"GroundRules: Original legal text. Not legal advice."}
