{"data":{"id":"us-ca/puc-379","jurisdiction":"us-ca","citation":"PUC § 379","heading":"","body":"Nuclear decommissioning costs shall not be part of the costs described in Sections 367, 368, 375, and 376, but shall be recovered as a nonbypassable charge until the time as the costs are fully recovered. Recovery of decommissioning costs may be accelerated to the extent possible.","path":["Public Utilities Code - PUC","DIVISION 1. REGULATION OF PUBLIC UTILITIES [201. - 3299.100.]","PART 1. PUBLIC UTILITIES ACT [201. - 2120.]","CHAPTER 2.3. Electrical Restructuring [330. - 400.3.]","ARTICLE 6. Requirements for the Public Utilities Commission [360. - 380.5.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"ea55ff8a03890313f949ed07e528acb50642f4289d3653d04b8d7a2a2b7bce85","source_id":"us-ca","stale":false,"prev":"us-ca/puc-378","next":"us-ca/puc-379.5"},"notice":"GroundRules: Original legal text. Not legal advice."}
