{"data":{"id":"us-ca/puc-454.54","jurisdiction":"us-ca","citation":"PUC § 454.54","heading":"","body":"In addition to the requirements of Section 454.52, the integrated resource plan of each load-serving entity shall contribute to a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy resources in a cost-effective manner, meets the emissions reduction targets for greenhouse gases described in subparagraph (A) of paragraph (1) of subdivision (a) of Section 454.52, and prevents cost shifting among load-serving entities.","path":["Public Utilities Code - PUC","DIVISION 1. REGULATION OF PUBLIC UTILITIES [201. - 3299.100.]","PART 1. PUBLIC UTILITIES ACT [201. - 2120.]","CHAPTER 3. Rights and Obligations of Public Utilities [451. - 666.]","ARTICLE 1. Rates [451. - 468.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"1076c774fcada7f24c3b680b64ffbb2c5c5e5cbb038e128f90fbb216af9ca51d","source_id":"us-ca","stale":false,"prev":"us-ca/puc-454.53","next":"us-ca/puc-454.55"},"notice":"GroundRules: Original legal text. Not legal advice."}
