{"data":{"id":"us-ca/puc-635","jurisdiction":"us-ca","citation":"PUC § 635","heading":"","body":"In a long-term plan adopted by an electrical corporation or in a procurement plan implemented by a local publicly owned electric utility, the electrical corporation or local publicly owned electric utility shall adopt a strategy applicable both to newly constructed and repowered generation owned and procured by the electrical corporation or local publicly owned electric utility to achieve efficiency in the use of fossil fuels and to address emissions of greenhouse gases.","path":["Public Utilities Code - PUC","DIVISION 1. REGULATION OF PUBLIC UTILITIES [201. - 3299.100.]","PART 1. PUBLIC UTILITIES ACT [201. - 2120.]","CHAPTER 3. Rights and Obligations of Public Utilities [451. - 666.]","ARTICLE 9. Long-Term Plans and Procurement Plans [635. - 635.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"253cdb77e83b778a22bb89d564e8870678622e321f7ef177f947ca2512fffa63","source_id":"us-ca","stale":false,"prev":"us-ca/puc-633","next":"us-ca/puc-650"},"notice":"GroundRules: Original legal text. Not legal advice."}
