{"data":{"id":"us-ca/puc-701.3","jurisdiction":"us-ca","citation":"PUC § 701.3","heading":"","body":"Until the commission completes an electric generation procurement methodology that values the environmental and diversity costs and benefits associated with various generation technologies, the commission shall direct that a specific portion of future electrical generating capacity needed for California be reserved or set aside for renewable resources.","path":["Public Utilities Code - PUC","DIVISION 1. REGULATION OF PUBLIC UTILITIES [201. - 3299.100.]","PART 1. PUBLIC UTILITIES ACT [201. - 2120.]","CHAPTER 4. Regulation of Public Utilities [701. - 940.]","ARTICLE 1. Generally [701. - 719.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"fabffbcb7f932ac9f528080ab79c88b2525025ace321d3afc148e0df92d067c5","source_id":"us-ca","stale":false,"prev":"us-ca/puc-701.1","next":"us-ca/puc-701.4"},"notice":"GroundRules: Original legal text. Not legal advice."}
