{"data":{"id":"us-ca/puc-7809","jurisdiction":"us-ca","citation":"PUC § 7809","heading":"","body":"Any proposed railroad track may be permitted to cross any track already constructed, the crossing being made as provided in Chapter 1 of this division. In laying down the track and preparing therefor, not more than one block shall be obstructed at any one time, nor for a longer period than 10 working days.","path":["Public Utilities Code - PUC","DIVISION 4. LAWS RELATING TO UTILITY CORPORATIONS AND THEIR EMPLOYEES [7503. - 8290.2.]","CHAPTER 2. Street Railroads [7801. - 7818.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"c19134f7a9b4e3729a90e7b8699448f7b38cd9bbd214c76c141a49aa7208e3f8","source_id":"us-ca","stale":false,"prev":"us-ca/puc-7808","next":"us-ca/puc-7810"},"notice":"GroundRules: Original legal text. Not legal advice."}
