{"data":{"id":"us-ca/shc-25153","jurisdiction":"us-ca","citation":"SHC § 25153","heading":"","body":"As soon as practicable after the filing of the engineer’s preliminary report, the board of directors shall give it full consideration and shall formulate a report of the project or projects for which the district is organized.","path":["Streets and Highways Code - SHC","DIVISION 16. HIGHWAY DISTRICTS [25000. - 27567.]","PART 1. JOINT HIGHWAY DISTRICTS [25000. - 25521.]","CHAPTER 7. Preliminary Surveys and Report of District Projects [25150. - 25155.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"a674aa1b83397640405d4897d2adcc24253e54e3b880d6767e765f79f33b611b","source_id":"us-ca","stale":false,"prev":"us-ca/shc-25152","next":"us-ca/shc-25154"},"notice":"GroundRules: Original legal text. Not legal advice."}
